Stall ledger
Price hemp hurd by the stall
Add farms and stall counts. The ledger prices hemp on the Dakota Hemp 30 lb bag schedule. Conservative is the default: 25 percent less labor, 40 percent less waste, half the compost counted as income.
Conservative is the case used on the rest of this site: 25 percent less labor, 40 percent less waste, half the compost. Expected and upside only loosen those three. The Dakota bag price does not change.
A cubic yard is a box three feet on each side.
| Pine | Hemp hurd | |
|---|---|---|
| Material | $697 | $176 |
| Labor | $1,643 | $1,232 |
| Waste hauled | 10 cubic yards | 6 cubic yards |
| Compost time | 2–3 years | 6–9 months |
| Net versus pine | — | $1,081 |
Pine material $697 · hemp material $176 · material saved $521. Pine labor $1,643 · hemp labor $1,232 · labor saved $411. Material + labor saved $932. Haul saved $74 — the 4 cubic yards the hemp column does not haul. This is the remainder already inside the locked $1,081. It is not a published hauler invoice. Compost credit inside the $1,081: 6 cubic yards × $25 = $150. The ledger books half of that, $75, as the barn’s credit. The other half stays with whoever runs the pad. $521 material + $411 labor + $74 haul + $75 compost credit = $1,081.
The $1,081 is the barn versus pine. Material, less stall labor, less haul, and a compost credit.
In Phase 1 the mill does not run the pad. The barn or the subcontracted hauler takes that pile. The stall can still beat pine. The mill is paid when it sells the bag.
Three prices, three jobs. Do not add them.
- $16 / 30 lb ($0.533/lb) — Dakota multi-pallet bag. What a converted barn pays. Saratoga 1,820 = $293,536.
- $0.60/lb — Dakota listed 1/4-inch cut. Plant cards also show a second price — the mill’s listed cut of hurd, sixty cents a pound. That is not the sixteen-dollar bag the barn pays. Do not add the two prices.
- $176 / stall — 11 bags × $16. The hemp material line in the pine-versus-hemp table.
Current material + labor
$102,938
Hemp material + labor
$61,307
Material saved
$23,564
Labor hours saved
1,004
Annual cost: current bedding vs hemp (material + labor)
Example row · 24 stalls
Net / stall
$1,081
Example row · 20 stalls
Net / stall
$1,081